One coordinator works on many projects in a day and enters the work log in an external tracker at the end of it. The day time log (since 0.17) keeps when the work moved from one card to another, so the day reads at a glance and the minutes for the tracker come from one place. relaybay shows the numbers and does not judge them: what counts as work, how it is rounded and whether it is billed stay with you. Behaviour in detail: SPEC, design 0028.

Marks and spans

A mark is start, switch or pause at a time. start and switch name a card or a free label (a call, e-mail, someone else's review); a pause names no card. A mark opens a span that runs until the next mark; a pause opens a gap. Today's last span runs until now.

A span that runs into the next day and is longer than a short late evening (at most 4 hours over midnight) is unclosed: it counts 0 and is listed with the hint to add the pause with that day's date, so a forgotten pause does not book the night. The day is the server machine's local date (in Docker: UTC unless TZ is set).

On the board

  • / opens with the day: its total, a strip of the spans coloured by project (labels grey, pauses as gaps, unclosed spans faint with a dashed edge), totals per project, what runs now, the marks with Delete, a form to add a mark and Pause. Arrows move to another day.
  • A card shows now since 13:50 · today 2h10 while it runs, or today 1h20 when it had time today.
  • The task dialog has a Time line under the session's state: today · total · in tracker, with Working on this now (start, or switch from the card that runs) and Pause.
  • A project row on / shows its time today, in total and in the tracker.

From a coordinator session

The tools are listed on /mcp and /mcp/coordinator (MCP tools):

When Call
You start on a card, or switch to another timelog_mark(kind="switch", task="acme-shop-12")
Work without a card timelog_mark(kind="switch", label="call with the customer")
Lunch, the end of the day timelog_mark(kind="pause"), or with at="17:40" afterwards
Look at the day timelog_list(), timelog_list(day="2026-11-24"), timelog_list(task="acme-shop-12")
A mark was wrong timelog_fix(mark=17, reason="started later", at="10:15"), or delete=true
Minutes entered in the tracker worklog_add(task="acme-shop-12", minutes=90, ref="ENG-12")

timelog_list answers with the day's spans and durations (1h05), totals per project, card and label, what runs now and the unclosed spans. A correction keeps the mark before and after on the Audit page. The tracker minutes are an append-only ledger: a correction is a negative row with a reason. The work-log mark of a card (tracker_logged) stays a separate field.

portfolio_digest has one line for today's time.

In coordinator mode

With coordinators set in the server's config, an agent's write to the time log is refused (The day time log is the coordinator's. Nothing changed.): the coordinator marks where you are. Without coordinators every caller may write. See Coordinator and agents workflow.